Woodward

Woodward SPM-D2-1010B/N wide range power supply 8440-2174

Woodward  SPM-D2-1010B/N wide range power supply  8440-2174

Woodward understands the time-intensive nature of Power Generation projects. Ensuring the longevity of

components is one way we can make our customers successful. Woodward has supplied and supported the

well-established SPM-D line of synchronizers for 20+ years. With the state of the art Drop-In replacement

successor, SPM-D2 the life of this synchronizer line is now extended. All of the SPM-D2 synchronizers are

password protected and are configurable either through HMI as before or through ToolKit configuration

tool with USB connectivity.

Important Features:

Drop-In Replacement

Same Look and Feel as SPM-D synchronizers

USB Connectivity to PC

Woodward ToolKit service tool support

RoHS 2 compliance

Refer to the appendix “A” for an overview on the feature upgrades of the new SPM-D2.

The new SPM-D2 is ready to be shipped from the manufacturing facility by end Feb’16. The SPM-D versions

will continue to be available as long as they can be built (anticipated through Apr’16). However, only upon

specific request.

GE WES13-3 2508-21001
GE WES13-3 5167-0001-0210
GE D20MIC10BASE-T 820-0756
GE WES5120 2340-21003
GE WES5120 2340-21005
GE SR469-P5-H-A20-T
GE PC000087524/01
GE CIFX50-C0
GE 8502-BI-DP
GE IS200VAICH1DAB
GE IS420UCSBH3A
GE IS220PSVOH1A
GE IS420UCSBH1A

Availability of SPM-D synchronizers

After 15-March-2016 any POs with old SPM-D item numbers cannot be accepted. We will request

our customers to change the PO to the corresponding SPM-D2 item numbers that are form, fit and

function successor.

In certain instances when an old SPM-D item number must be applied, upon specific request till 30

April-2016 Woodward can provide the old item number until the stock is depleted.

In these special circumstances the accepted orders of the old SPM-D will be delivered till 30-June

2016.

During the transition period, production of the old SPM-D synchronizers is continued for a short

while via a dedicated temporary production process. This forces us to apply a 50% price increase on

16th March 2016. The pricing of the drop-in successors remains the same as that of corresponding

predecessors before the price increase.

Please contact your Account Manager for more information.

After 30-April-2016. Woodward will commit to the following support plan for the old SPM-D items:

01st May 2016 – 30th April 2017

Repairs

Limited spares based upon the available inventory

01st May 2017 – 30th April 2019

Limited repairs based on components availability

Further parts obsolescence from electronic manufacturers can present a challenge to post-life support

plans. Woodward strives to hold inventory, or look for alternative parts when components are obsolete.

However, there are times when components can simply not be obtained and where sufficient last-time

buys cannot be made. In these cases, Woodward cannot always guarantee that we can maintain the

rationalization support plan.

Password protection for SPM-D2-10xx/YB variants

Configuration through HMI without limitation on number of backwards navigation (SPM-Ds are

limited to four time backwards navigation)

Loading default values (reload factory default settings)

Description of the devices change from SPM-Dxxxx to SPM-D2-xxxx

Hardware and Compliance – – – – –

Declared DC power supply rating 120…375Vdc to the wide range power supply variants (with “N”

extension in description). These units already supports 90..250Vac rating power supply

Removed C-Tick mark from all labels of the SPM-D2

All new units are prepared according to RoHS 2 compliance

Ethernet hardware is prepared for further releases (for info)

Marine classification Societies (ABS, LR, DNV) Pending!

Leave a Reply

Your email address will not be published. Required fields are marked *